RPD 35
Autonomous robotic pile driver
Availability: Market Ready
Known Customers
Key Highlights
Installs piles up to 5× faster than traditional methods, reducing cycle times to as little as 1–3 minutes per pile.
Achieves millimeter-level accuracy using RTK GPS, IMUs, and advanced sensors to minimize inspection and rework.
Carries up to 224 piles in one load to maximize daily output and reduce material handling time.
Automatically detects refusal and moves to the next pile, keeping production on schedule without manual intervention.
Case Studies
Blattner and Built Robotics achieve 2.5× faster solar pile installation with 24-hour autonomous operation and improved safety.
- 2.5× productivity gain compared to manual piling crews
- 24-hour autonomous operation with tandem excavator configuration
- Elimination of high-risk manual pile-driving tasks for workers
More Robots in This Category
Exosystem
Built Robotics
Retrofit kit for autonomous excavating
Autonomous rebar tying
Max-ltd
Autonomous mobile rebar tying robot
Tomorobo
Ken Robotech
Autonomous mobile rebar tying robot
Grid
Spacer Robotics
Autonomous mobile rebar tying robot