Lift bot
Robotic lift for construction materials
Availability: Market Ready
Known Customers
Key Highlights
Moves up to 8,000 pounds of material per 8 hour shift with a 3 person crew, keeping scaffolding continuously supplied.
Operates at 42 meters per minute (138 feet per minute) to move loads quickly between scaffold levels.
Certified working height up to 50 meters (165 feet) for mid and high rise scaffold access.
Battery system delivers up to 10 hours of use and recharges in about 3 hours on a standard 110 or 230 volt outlet.
Case Studies
KEWAZO’s LIFTBOT reduces scaffolding man-hours by 40% on Boston high-rise restoration, saving $59,200 in a single month.
- 40% reduction in man-hours (1,472 → 880)
- Labor cost savings of $59,200 per month
- Crew size reduced from 8 to 5 scaffold builders
KEWAZO’s LIFTBOT achieves 74% labor-hour savings on UK scaffolding project, cutting crew size by 70% and saving €120K in under two months.
- 74% reduction in total man-hours (5,040 → 1,280)
- Crew reduced from 14 to 4 scaffolders
- €120,320 cost savings in 51 days
Trekker Group completes Florida scaffolding project twice as fast using two LIFTBOTs, saving $24K and 600 man-hours in one week.
- 50% reduction in total man-hours (1,200 → 600)
- $24,000 labor cost savings in one week
- 2× faster completion (12 → 6 days)