Barton Malow
Contractor USA
What RIC holds on Barton Malow
How each link is evidenced
3 verified1 published0 stated
Capabilities
Aggregated from the deployment record — not self-described.
Segments energyindustrial
Tasks on record Solar pile layoutSite layoutsolar panel positioningpre-drillingpile stagingground elevation32-inch CMU block placementlift-assist masonryat least 2 MULEs
Robots this company operates
- CivDot Civ Robotics 1 deployment on record
- CivDot+ Civ Robotics 1 deployment on record
- Mule ML150 Construction Robotics (CR) 1 deployment on record
- CivDot Mini Civ Robotics
The record
3 deployments on public record
| Robot | Project | Also on record | Country |
|---|---|---|---|
| CivDot | (unnamed) production | — | Not stated |
| CivDot+ | Utility-scale solar (>100MW) production | — | USA |
| Mule ML150 | Ford Central Campus production |
Leidal & Hart
|
USA |
Is this your company?
This record is assembled from public sources, so it is very likely incomplete.