CCS Industrial Services
Services Brazil
What RIC holds on CCS Industrial Services
How each link is evidenced
1 verified0 published0 stated
Capabilities
Aggregated from the deployment record — not self-described.
Segments infrastructure
Tasks on record Concrete removal at tunnel crown (overhead) and vertical sidewallsTunnel 1: 500 ft x 14 ft x 2 inTunnel 2: 250 ft with 6 in deep x 10 ft panelsTotal ~28,800 sq ft (2,676 m2)
Robots this company operates
- ACR Robot 557 MPA Conjet AB 1 deployment on record
The record
1 deployment on public record
| Robot | Project | Also on record | Country |
|---|---|---|---|
| ACR Robot 557 MPA | Northwest Cornell Road Tunnel Restoration production | — | USA |
Is this your company?
This record is assembled from public sources, so it is very likely incomplete.