ICA (İçtaş–Astaldi)

General contractor

1
Deployments on RIC
1
Robots on its records

Deployments

  1. ICA (İçtaş–Astaldi) used two Aquajet Aqua Cutters, with an Aqua Cutter 410A controlling a 10 m Aqua Spine mast, to remove surplus concrete near the top of a 120 m pylon of the Petrovsky Fairway Bridge in St Petersburg.

Is this ICA (İçtaş–Astaldi)?

Claiming this page is free. Confirm the record, add projects, figures and dates, set the regions and jobs you take, and choose whether to receive job requests.

Claim this page

Leave an email and we'll get in touch about maintaining this profile.

How corrections work