Penn Hydro, Inc.
Contractor USA
What RIC holds on Penn Hydro, Inc.
How each link is evidenced
2 verified0 published0 stated
Capabilities
Aggregated from the deployment record — not self-described.
Segments infrastructure
Tasks on record Concrete removal from spillway floor and walls (160 m3 at 150 mm avg depth)Wall cap removal (107 m3 at 380 mm avg depth)Wastewater managementHorizontal to vertical switching
Robots this company operates
- ACR Robot 557 H Conjet AB 1 deployment on record
- ACR Robot 557 MPA Conjet AB 1 deployment on record
The record
2 deployments on public record
| Robot | Project | Also on record | Country |
|---|---|---|---|
| ACR Robot 557 H | Alcova Dam Spillway Rehabilitation production | — | USA |
| ACR Robot 557 MPA | Alcova Dam Spillway Rehabilitation production | — | USA |
Is this your company?
This record is assembled from public sources, so it is very likely incomplete.