  1. Brokk 500Image: Brokk AB

    A BMJ operator removed 800 m³ of concrete from a deteriorated 15 m hydropower-plant pillar in 100 hours, working from the top with a Brokk 500 lifted into place.

    Hydropower plant concrete pillar demolition, Sweden

    Brokk 500BMJ Betonghåltagning & Entreprenad

Deployments

  1. A BMJ Betonghåltagning & Entreprenad operator demolished a deteriorated concrete pillar at a hydropower plant with a Brokk 500 lifted onto its 15-meter top, taking about 100 hours for 800 m3 of concrete.