Skanska USA building

Contractor USA

What RIC holds on Skanska USA building

How each link is evidenced 5 verified0 published0 stated

Capabilities

Aggregated from the deployment record — not self-described.

Segments institutionalhealthcareinfrastructurecommercial

Tasks on record 8-inch and 12-inch normal weight CMUCOVID-19 compliant single-mason operation48,500 sq ft facilitystarted with 6 MULEs, expanded to 9Healthcare layout; 3.3M sq ft linework, 6864 man-hours savedOverhead drilling (500 holes/day)Interior layoutUnified aerial/ground captureremote monitoringProcore integrationfixed camera integration3D overlaysvolume analysis400,000+ sq ft campus6 major lab and housing structures

Robots this company operates

The record

6 deployments on public record

Deployments on record for Skanska USA building
Robot Project Also on record Country
DroneDeploy Multiple projects (including Cold Spring Harbor Lab) production USA
DroneDeploy Cold Spring Harbor Laboratory demonstration USA
FieldPrinter 2 3-story medical facility production USA
HP SitePrint Penn Station renovation production USA
Jaibot Malmo Hospital production Sweden
Mule ML150 Patricia Reser Center for the Arts production Bratton Masonry USA

Is this your company?

This record is assembled from public sources, so it is very likely incomplete.

Correct the record for Skanska USA building

Tell us what is missing or wrong and we will check it against the source.