Maximo

Maximo RoboticsUtility-Scale Solar Installation

Tracked robot that places heavy utility-scale solar modules onto racking alongside install crews

5
Deployments
1
Companies that ran it

How it works on your site

Maximo places utility-scale solar modules onto tracker racking: a high-speed robotic arm on a tracked carrier lifts each module from the stack it carries and sets it in position, using lidar and cameras for placement. It works the row alongside a professional install crew, and Maximo Robotics supplies it as a service in which customers pay per task completed. Placement is the current deployment; module attachment and field logistics are offered as contract expansions.

Module Placement onto Racking

The robot drives along the row on rubber tracks with a stack of modules on board. Its robotic arm picks up each module and sets it onto the racking, using lidar and cameras to place it precisely, while the crew works the row alongside it.

Field outcomes

1 of 5
  1. MaximoImage: Maximo Robotics

    A fleet of Maximo robots installed solar modules on the second phase of AES' Bellefield project in Kern County, California, scaling from one robot to four units working in parallel alongside union technicians; Maximo had installed 100 MW at the Bellefield complex by March 2026.

    Bellefield 2, USA

    MaximoMaximo Robotics

  2. MaximoImage: Maximo Robotics

    Maximo installed solar modules at the first phase of AES' Bellefield solar-plus-storage project in Kern County, California.

    Bellefield 1, USA

    MaximoMaximo Robotics

  3. MaximoImage: Maximo Robotics

    Maximo made its utility-scale debut installing solar modules on a portion of the 260 MW Oak Ridge solar project in Morehouse, Louisiana, working in extreme heat.

    Oak Ridge Solar, USA

    MaximoMaximo Robotics

  4. MaximoImage: Maximo Robotics

    Maximo installed solar modules at the MacGregor Park solar project in Dayton, Ohio, AES' innovation hub, where its capabilities were tested and validated.

    MacGregor Park solar project, USA

    MaximoMaximo Robotics

  5. MaximoImage: Maximo Robotics

    Maximo carried out its first MW-scale deployment at the 198 MW Cavalier solar project in Elberon, Virginia, installing a portion of the project's solar modules.

    Cavalier solar project, USA

    MaximoMaximo Robotics

Who has run it

5 deployments · 1 company · 1 country

Will it work on your site

Positional accuracy
Vendor: millimeter-precision placement of heavy solar modules.
Speed
Vendor: crew members working alongside Max 4.0 install at 2.5 times their manual rate per person per shift hour.
Navigation
Lidar and cameras give the robot spatial awareness for precise module placement.
Autonomy
Places modules by itself; an operator controls it through a simple interface and holds a safety switch, with the install crew working the row alongside.
Safety design
Sensors detect people in the working area and stop the robot; the operator holds a safety switch during operation.
Control interface
Operator interface for control; construction analytics track installation data for each task.
Show all 11
Environment
Outdoor solar sites in high heat, low temperatures and rain, including remote locations and desert climates.
Power
Mobile microgrid power, carbon-free, for extended shifts.
Fleet management
Runs as a fleet: the Bellefield project scaled from one robot to four units operating in parallel.
Generation
Max 4.0, released in October 2026, follows the version 3.0 units that installed at AES Bellefield.
Other capabilities
Works on a wide range of torque tube heights; a dynamic cradle adapts to different module sizes, models and manufacturers.

As the maker states it.

Want more information?

We send your request to Maximo Robotics, the maker.

Something wrong? How corrections work

Make this robot? Claim the profile

Leave an email and we'll get in touch about maintaining this profile.