IronBOT rebar placing robotImage: Advanced Construction Robotics

IronBOT

Advanced Construction RoboticsConcrete Construction

Rail-riding gantry robot that lifts rebar bundles up to 5,000 lb and places bridge deck bars

4
Deployments
2
Companies that ran it

How it works on your site

IronBOT rides rails along a bridge deck, lifts rebar bundles of up to 5,000 lb and places the horizontal deck bars in both directions. It needs rails, either an existing screed rail or supplied ones, and bar chairs of 1.0 in or more. A Robot Supervisor positions it, enters the bar spacing and separates bars from each bundle by hand, and tying is done separately. It handles bar sizes #4 to #8.

Rebar Placement and Tying

Field outcomes

1 of 2
  1. IronBOTImage: Advanced Construction Robotics

    Shelby Erectors piloted the IronBOT alongside TyBOT on the Port St. Lucie West Boulevard Bridge in Port St. Lucie, Florida, in February; rebar installation estimated at 14 days was completed in seven days.

    Port St. Lucie West Boulevard Bridge widening over I-95, USA

    IronBOTShelby Erectors

  2. IronBOTImage: Advanced Construction Robotics

    IronBOT, Advanced Construction Robotics' rebar-placing robot, worked on a bridge in Manatee River, Florida.

    Bridge over the Manatee River, Florida (photo caption; probably the Bradenton-area crossing, not verified), USA

    IronBOT

Who has run it

4 deployments · 2 companies · 1 country

Will it work on your site

Site Preparation
Rails, bar chairs of 1.0 in or moreBundles staged at the catch point and groomed
Control Interface
Belly Box transmitter with E-StopSkip, Continue and Replace overrides
BIM/CAD Requirements
No BIM input, vendor-statedCustomer page says placement follows the job's plans
Travel Speed
12.1 m/min (0.66 ft/s)Auto-advances bar to bar, vendor-stated